This project is under the JICA Grant Assistance in health sector infrastructure damaged by April 2015earthquake. The 4 story 100 bedded RCC framed structure hospital building with basement compartment for services. Total built-up area in 4 floors is 35154 sq.ft. having 100 bed capacity with all required amenities. The building also has 24 hemodialysis beds in Nephrology Ward, Gastrology Ward with 3 Endoscopy rooms and ERCP (X-Ray) room, Cardiology Ward with CATH Lab. The building is equipped with auto sprinkler firefighting system. DG+Solar back-up system, VRF air-conditioning system, lift, fire exit stair, etc.
